TC Grapevine Land LLC filed for the $38 million, roughly 315,000-square-foot Avina Apartments at 2800 Grapevine Mills Parkway in Grapevine: 11 buildings, including an amenity and leasing building and three- and four-story unit buildings. GFF is the designer; work is scheduled from Feb. 1, 2027, to Feb. 1, 2028. See the filing.
Southwest Christian School filed for a $21 million, 62,000-square-foot indoor athletic center at 6901 Altamesa Blvd. in southwest Fort Worth. Corgan is the designer; work is scheduled from Feb. 1, 2027, to July 15, 2028. See the filing.
Hurst-Euless-Bedford ISD filed for a $4 million, 17,500-square-foot restroom and concession building at Trinity High School in Euless. Huckabee of Fort Worth is the designer; work is scheduled from Jan. 4 to July 30, 2027. See the filing.
MM Rio Claro 620 LLC of Farmers Branch filed for a $1.8 million Phase 1 amenity center — a restroom building, pool, pickleball courts, playground and parking — at Bonds Ranch Road and Dosier Creek Parkway in far north Fort Worth. Studio 13 Design Group is the designer; work is scheduled May 1 to Aug. 1, 2027. See the filing.
QT South LLC filed for an $850,000, 6,445-square-foot QuikTrip store with gas sales at 9720 N. Crowley Road in Fort Worth, scheduled June 1, 2027, to Feb. 1, 2028. See the filing.
ABLE Communications filed for a $600,000 remodel of 33,364 square feet of office space at 1900 W. Kirkwood Blvd., Suite 3000A, in Southlake. Varispace Southlake LLC is the owner and SJE Architects the designer; work is scheduled Nov. 13 to Feb. 15. See the filing.
A $550,000, 7,800-square-foot interior finish-out called Grounds Reserve at 5030 Northern Cross Blvd. in Haltom City lists the City of Haltom City as owner. Work is scheduled Dec. 1 to April 30. See the filing.
A $540,000, 6,494-square-foot interior finish-out for Tu Chilito at 3990 NE Loop 820, Suite 300, in Haltom City lists Haltom City Forest Properties LLC as owner. Work is scheduled Dec. 1 to April 30. See the filing.
Mother Parker’s Tea and Coffee USA filed for a $500,000, 4,493-square-foot equipment mezzanine for coffee production inside its plant at 7800 Will Rogers Blvd. in south Fort Worth. Carpenter & Associates of Southlake is the designer; work is scheduled Dec. 1 to Aug. 30, 2027. See the filing.
A $418,000 tenant improvement listed as Compass, 9,958 square feet at 550 Reserve St., Suite 600, in Southlake, names GPI-MT LP as owner and Entos Design as designer. Work is scheduled Nov. 1 to March 31. See the filing.
A $390,000 remodel of the “Insight Intel Room,” 1,329 square feet at 6037 Campus Drive in south Fort Worth, lists TREA JS South Fort Worth Industrial Portfolio LLC as owner and P Shade Design as designer. Work is scheduled Nov. 2 to Jan. 15. See the filing.
LN America LLC filed for $250,000 in fuel canopy, underground tank and dispenser work at Ride USA 7, 3600 Miller Ave. in southeast Fort Worth, scheduled Dec. 1 to May 1. See the filing.
Fort Worth Everman Risinger Development LLC filed for $150,000 to install 15 new dock pits and levelers at a 781,530-square-foot building at 9401 Hemphill St. in south Fort Worth, scheduled Oct. 30 to June 1. See the filing.
The City of Fort Worth filed a $138,582 sidewalk and ramp repair project (2026 Asphalt Resurfacing Contract 6) covering Griggs Avenue, Ada Avenue, Avenue J, Oakland Boulevard and other streets. See the filing.
Stadium Warehouse LLC filed for a $90,000 renovation of Suite 350, about 4,700 square feet, at 4205 Stadium Drive in Fort Worth. HRO Architects is the designer; work is scheduled Nov. 15 to March 31. See the filing.